The image below shows one possible setup:
1
Start of the rack with the BR9300 module. The inputs/outputs are supplied up to point 2.
2
A PS2100 module needs to be inserted here to supply the subsequent inputs/outputs with 24V up to point 3. This
setup could, for example, be a locking unit.
3
A PS2100 module is inserted again here to supply the remaining inputs/outputs with 24V. This setup could, for
example, be another locking unit.
7
Electric components and wiring
PLC
100
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Содержание SPS 4000
Страница 114: ...7 Electric components and wiring PLC 114 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 142: ...8 Notes 8 Notes 142 Fröling GesmbH A 4710 Grieskirchen Industriestraße 12 www froeling com ...
Страница 143: ...Notes 8 Service manual SPS 4000 B0960622_en 143 ...