62
Festo — MSE6-C2M — 2022-08b
Commissioning
1
2
3
Fig. 26: DIL switches on bus node CPX-M-FB44
1
DIL switch 1: operating mode
2
DIL switch 2: diagnostic mode
3
Memory card
1. Switch off the power supply.
2. Unscrew the retaining screws of the cover.
3. Remove the cover
è
2 DIL switches are visible.
4. Use DIL switch 1 to set the operating mode.
5. Set the diagnostic mode with DIL switch 2.
6. Fit the cover.
7. Tighten the retaining screws of the cover. Tightening torque: 0.4 Nm ± 10 %.
Setting operating mode, DIL switch 1
All switch elements of the DIL switch 1 must be in the OFF position.
DIL switch 1
Setting operating mode
DIL 1.1: OFF
DIL 1.2: OFF
(factory setting)
Remote I/O operating mode
All functions of the energy efficiency module are controlled directly
by the controller or by a higher-level PLC.
DIL 1.1: ON
DIL 1.2: OFF
Not supported by the energy efficiency module.
DIL switch elements 1.1 and 1.2 must be in the OFF position.
DIL 1.1: OFF
DIL 1.2: ON
DIL 1.1: ON
DIL 1.2: ON
Tab. 44: Setting the operating mode with DIL switch 1