Festo — MSE6-C2M — 2022-08b
Commissioning
51
2. Check the electrical wiring.
3. Check the earth terminal.
4. Check the settings of the DIL switches.
The characteristics of the energy efficiency module can be adapted to various requirements.
You can carry out important settings as follows:
–
with the DIL switch directly on the bus node.
–
with parameterisation.
The energy efficiency module is delivered with preset DIL switches and parameters.
Information on DIL switches
NOTICE
Unauthorised Access to the Device Can Cause Damage or Malfunction.
• When connecting the device to a network, protect the network from unauthorised access.
Standards for security in information technology can be used for network protection measures, e.g.
IEC 62443, ISO/IEC 27001.
8.3
Commissioning with bus node CPX-M-FB36
This section describes the interfaces, DIL switches and display elements of the bus node mentioned
and provides an overview of the configuration and commissioning with this bus node.
For detailed information on the bus node, see the documentation on the bus account
A configuration for the energy efficiency module can be created using the software ‘Festo Maintenance
Tool’, CPX-FMT