4. Commissioning
4-29
Festo P.BE-DLP-VSE-... en 0206a
4.4
Commissioning test for PROFIBUS-DP and AS-Interface
Warning
Check the configuration of your system before commis-
sioning the Local control unit with your bus system.
1. Turn the key-operated switch to the position AUTO/RE-
MOTE. The Local control unit will now be controlled by
your bus system.
2. Test the controller and the movement of the fittings with
your bus system.
Information on error treatment can be found in the chapter
“Diagnosis and error treatment”.
Содержание DLP-VSE Series
Страница 1: ...Manual Local control unit DLP VSE DLP VSE DP DLP VSE ASI Manual 396 535 en 0206a...
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE DLP VSE en 0206a...
Страница 8: ...Contents and general instructions VI Festo P BE DLP VSE en 0206a...
Страница 20: ...1 Summary of components 1 8 Festo P BE DLP VSE en 0206a...
Страница 54: ...3 Installation 3 30 Festo P BE DLP VSE en 0206a...
Страница 84: ...4 Commissioning 4 30 Festo P BE DLP VSE en 0206a...
Страница 104: ...5 Diagnosis 5 20 Festo P BE DLP VSE en 0206a...
Страница 108: ...A Technical specifications and index A 4 Festo P BE DLP VSE en 0206a...