3. Installation
3-3
Festo P.BE-DLP-VSE-... en 0206a
Removing
1. Loosen the locking screw or locking ring of the screw
connector.
2. Pull out the tubing.
3. If applicable, replace screw connector with plug 4.
1
Quick connectors
2
Locking screw
3
Quickstar con-
nection
4
Plug
1
2
3
4
Fig. 3/10: Removing the tubing
3.1.2 Assigning the pneumatic connections
Connect the tubing for the pneumatic connections as shown
in Fig. 3/11.
Caution
Connect the tubing of the Local control unit with the cylin-
der, so that the fittings open or are open when the knob-
operated switch is in the position AUF/OPEN. The same
applies to ZU/CLOSE and “Closed.”
Содержание DLP-VSE Series
Страница 1: ...Manual Local control unit DLP VSE DLP VSE DP DLP VSE ASI Manual 396 535 en 0206a...
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE DLP VSE en 0206a...
Страница 8: ...Contents and general instructions VI Festo P BE DLP VSE en 0206a...
Страница 20: ...1 Summary of components 1 8 Festo P BE DLP VSE en 0206a...
Страница 54: ...3 Installation 3 30 Festo P BE DLP VSE en 0206a...
Страница 84: ...4 Commissioning 4 30 Festo P BE DLP VSE en 0206a...
Страница 104: ...5 Diagnosis 5 20 Festo P BE DLP VSE en 0206a...
Страница 108: ...A Technical specifications and index A 4 Festo P BE DLP VSE en 0206a...