19
en
Track guidance through guide chain
Assemble the length of the guide chain in accordance with the Table.
To achieve optimal chain pre-tension, you may want to use the 31.75 mm half
chain pieces included in the tool kit.
Order number 3 02 31 034 01 0 (l = 635 mm)
Order number 3 02 31 036 01 0 (l = 63.5 mm)
Order number 3 02 31 035 01 0 (l = 31.7 mm)
–
Fasten the guide chain to one of both chain pieces on the chain tensioner with
chain bolt and securing ring.
–
Thread the guide strand of the guide chain through below the two guide-chain
sprockets (Fig. H).
–
Fasten the free end of the guide chain to the chain tensioner with chain bolt and
securing ring.
–
Snug the guide chain against the pipe by turning the hexagon at the chain ten-
sioner (
2
).
–
Align the guide chain with a clearance of 10 mm (bolt of drive chain to bolt of
guide chain) and check three times around the circumference.
–
Tension the chain tensioner via the hexagon (
29
) until the washer (
30
) faces
against the housing of the chain tensioner (tensioning range approx. 50 mm).
(Max. tightening torque 50 Nm)
Caution! Danger of accidents!
Do not turn or screw the three securing screws (
31
) on the
face side. (see figure H)
Final work after each work assignment.
–
Retract the application tool.
–
Switch the pipe milling machine off.
–
Remove the application tool.
–
Dismount pipe milling machine from pipe.
Storing the pipe milling machine.
–
Protect the external metal parts against corrosion.
–
Store pipe milling machine at a dry location.
Maintenance and Repairs.
On maintenance and repairs.
For FEIN power tools and accessories in need of repair, please contact your FEIN
after-sales service. The address can be found on the Internet under www.fein.com.
The current spares parts list for this power tool can be found on our website at
www.fein.com.
Use only original spare parts.
If required, you can change the following parts yourself:
Application tools, handles,
chain, chain links
The machine may only be operated when in technically proper condition.
Worn or damaged application tools and components must be replaced imme-
diately with new ones.
Danger of injury
through unintentional switching on.
Before any work on the pipe milling machine, pull the mains plug!
General information
Maintenance work may only be carried out by trained specialists.
The servicing and maintenance work basically include:
–
Exterior cleaning of the pipe milling machine and clamping chains.
–
Visual checking of the complete pipe milling machine.
–
Changing the gearbox oil.
–
Greasing the moving threads and chains.
–
Greasing the guides of the tool spindle head in the clamping and transport
device.
–
Renewing the stickers and warning indications on the machine.
Maintenance of chain links
After removing coarse debris, carefully clean the link chains with benzine, kerosene
or similar while moving the chain links.
To ensure lubrication, place the chains afterwards in viscous oil, e.g. SAE 140 gear
oil, for several hours.
Danger of accidents!
Before reusing the chain links, carry out a thorough visual inspection to
ensure that they are in proper condition. Replace damaged parts and missing
securing rings.
Power supply cord
When the machine's power supply cord is damaged, it must be replaced by the
manufacturer or their representative.
Feed mechanism (see figure A)
–
Keep surface area of pipe nut (
17
) free from debris and any rust; always apply
a light coat of grease.
–
When changing gearbox oil, clean and grease moving threads.
Disassembly:
–
Remove pan head screw (
8
).
–
Pull bolt (
5
) out of lid.
–
Afterwards, screw feed mechanism out of pipe nut using hand crank.
–
Clean and grease the threaded parts (see section Lubricants and lubrication
chart on page 19).
–
Replace damaged scraper rings.
Assembly:
Assembly is carried out in reverse order. Do not damage scraper rings when
assembling!
Tightening device
Avoid contamination of the threads on the eyebolts (
3
, Fig. I) in the spring tube.
Clean and grease threads as required.
Lubricants and lubrication chart
Upon delivery, the tool spindle head is filled with ARAL oil Degol BMB 100. We
must strongly advise against the use of any other gear oil.
Chain length of guide chain
Pipe
diameter
Chain
length
Chain pieces
[mm]
[mm]
mm 63.5
mm
mm
250
710
1
1
1
300
870
1
4
0
350
1030
1
6
1
400
1190
1
9
0
450
1344
2
1
1
500
1500
2
4
0
550
1660
2
6
1
600
1809
2
8
1
650
1970
3
1
1
700
2130
3
4
0
750
2290
3
6
1
800
2440
3
8
1
850
2600
4
1
0
900
2760
4
4
0
950
2921
4
6
0
1000
3079
4
8
1
1100
3397
5
3
1
1200
3714
5
8
1
1300
4032
6
3
1
1400
4330
6
8
1
1500
4640
7
3
1
H
1
30
29
31
Lubricating agent
ARAL oil Degol
Filling quantity
Temperature
range [°C]
Specification
BMB 460
2 liters
0 to +60
Gear oil, type
CLPF acc. to
DIN15502
BMB 100
2 liters
-20 to +40
!
Содержание RSG Ex 1500 A Series
Страница 1: ...RSG Ex 1500 A 7 360 RSG Ex 1500 B 7 360 RSG Ex 18 A 7 360 RSG Ex 18 B 7 360...
Страница 282: ...282 th 4 a b c d e f g h 5 a RSG Ex 20 A HSS 16 3 6 21 2 28 10 34 B 34...
Страница 290: ...290 th www fein com CE EFTA European Free Trade Association EU EFTA FEIN C E Fein GmbH D 73529 Schw bisch Gm nd...
Страница 298: ...298 ja RSG Ex 3 2 3 3 I 3 2 3 FEIN 3 07 02 041 01 4 A 293 294 295 294 296 FEIN 11...