Installation
Proline Prosonic Flow 93C FOUNDATION Fieldbus
12
Hauser
3
Installation
3.1
Incoming acceptance, transport and storage
3.1.1
Incoming acceptance
On receipt of the goods, check the following points:
• Check the packaging and the contents for damage.
• Check the shipment, make sure nothing is missing and that the scope of supply matches your
order.
3.1.2
Transport
The devices must be transported in the container supplied when transporting them to the measuring
point.
"
Caution!
Flanged devices should never be lifted at the sensor nozzle for transportation purposes. To transport,
lift or insert the sensor into the pipe, only use the metal holders fitted on the flange.
3.1.3
Storage
Note the following points:
• Pack the measuring device in such a way as to protect it reliably against impact for storage (and
transportation). The original packaging provides optimum protection.
• The storage temperature corresponds to the ambient temperature range (Page 82) of the
transmitter, the sensors and the corresponding sensor cables.
• The measuring device must be protected against direct sunlight during storage in order to avoid
unacceptably high surface temperatures.
Содержание Proline Prosonic Flow 93C
Страница 2: ......
Страница 90: ...www endress com worldwide BA00145D 06 EN 13 10 71121226 FM SGML6 0 ProMoDo...