PROline Promag 10
4 Wiring
Hauser
47
4.5 Post-connection
check
Perform the following checks after completing electrical installation of the measuring
device:
Device condition and specifications
Notes
Are cables or the device damaged (visual inspection)?
−
Electrical connection
Notes
Does the supply voltage match the specifications on the nameplate?
85...250 V AC (50...60 Hz)
11...40 V DC
20...28 V AC (50...60 Hz)
Do the cables comply with the specifications?
Do the cables have adequate strain relief?
−
Cables correctly segregated by type?
Without loops and crossovers?
−
Are the power supply and signal cables correctly connected?
See the wiring diagram in the
interior of the connection
compartment
Are all screw terminals firmly tightened?
−
Have the measures for grounding/potential equalisation been correctly
implemented?
Are all cable entries installed, firmly tightened and correctly sealed?
Cables looped as "water traps"?
Are all housing covers installed and firmly tightened?
−