Magnefix MD4
991.184 G01 03
5
Connection of plastic-insulated cables to Protected panels ............................ 67
Plastic-insulated cable with copper core up to 3 x 70 mm
..................................... 67
Connection of plastic-insulated cables with copper cores, 3 x 95 mm
SYSTEM OPERATION .......................................................................... 75
Earthing a cable using three-pole high-speed earthing .......................................... 88
Measuring, testing and phase sequence testing ............................................... 94
SYSTEM COMMISSIONING AND DECOMMISSIONING ..................... 96
INSPECTION, MAINTENANCE AND REPAIR OF THE SYSTEM ........ 98