Magnefix MD4
991.184 G01 03
35
3.6 Connecting the paper-insulated lead-
covered cables (GPLK)
3.6.1
PILC with copper core up to
3 x 70 mm
2
, universal clamps
W
ARNING
Always earth the installation.
•
Never work on a live or partly live installation.
Required components
1 small cable box (a) for core cross sectional areas up
to 70 mm
2
(height: 385 mm) or
1 medium-sized cable box (b) for core cross sectional
areas up to 150 mm
2
(height: 540 mm)
2 protection covers (c)
1 hose clip (d)
polyethylene tape (e)
3 cable core clamps (universal)
2 steel cable clamps.
Cable box for PILC with copper core up
to 3 x 70 mm
2
R
EMARK
It is also possible to use a cable box with gland or
entry bushing.
Procedure
1. Incise the cable at the correct length, as shown.
L1 = 515 mm for a small cable box
L1 = 700 mm for a large cable box
R
EMARK
To simplify insertion of the cable cores in the right
tubes of the cable box, it is recommended to cut
the cable cores to different lengths.
2. Terminate the cable, as shown.
L2 = 170 mm for a small cable box
L2 = 200 mm for a large cable box
d = diameter across the lead sheath
Remove the lead sheath over distance (d).
Remove the sharp edges of the lead sheath.
Universal cable core clamps Cu to 70 mm
2
1, 2