MAINTENANCE
SECTION 5
Page 13
DRESSTA
OM515C520C99/1E
LUBRICATION
WARNING! Never run the engine when cleaning or lubricating the machine
because serious injury could result from contacting moving parts. Before
servicing the machine, be sure the engine is off, the bucket is lowered, the
transmission range gear lever locked in neutral position, the parking brake
applied and the electric master switch is off and the key is removed.
The lubricating fittings (see Fig. 5.2 and 5.2.A) are to be greased at the intervals indicated in the
service chart.
Always use a clean lubricator. Wipe all accumulated dirt from fittings before applying fresh grease.
Apply grease at each fitting until fresh grease appears. If grease fails to go through the fitting,
determine the cause and correct it. Other service points such as the pedals, cab hinges and
superstructure hinges which are not fitted with lubricating fittings must also be lubricated with
a brush or otherwise.
Lubricating Points as shown in Fig. 5.2.:
10 Bolster Pivots
2 points
7 Rear Axle Drive Shaft
2 points
11 Center Articulation Pivot Bearing
2 points
7 Countershaft
3 points
7 Transfer Drive Bearing
1 point
7 Front Axle Drive Shaft
2 points
9 Steering Cylinders Pivots
2 points per cylinder
9 Boom Cylinder Pivots
2 points per cylinder
8 Bucket Link Pins
2 points
8 Bucket Pins
2 points
9 Bellcrank Pin
1 point
9 Bucket Cylinder
2 points
9 Boom Pivots
2 points
14 Transmission Control Lever
2 points
14 Boom and Bucket Control Levers
2 points (std version only)
14 Auxiliary Equipment Control Lever
1 point (std version only)
15 Tracking System Pivots
2 points per lever (std version only)
If a loader is equipped with a multi-purpose bucket grease the following points every 50 hours of
operation – Fig. 5.2A.
16 Clam Cylinder Upper Pins,
High-dump Bucket Cylinder Upper Pins
1 point on each side
1 point on each side
17 Clam Hinge Pins,
High-dump Bucket Hinge Pins
1 point on each side
1 point on each side
18 Clam Cylinder Lower Pins,
High-dump Bucket Cylinder Lower Pins
1 point on each side
1 point on each side
Содержание 515C
Страница 3: ...OM515C520C99 1E DRESSTA ...
Страница 5: ......
Страница 7: ......
Страница 10: ...SECTION 1 INTRODUCTION ...
Страница 11: ...INTRODUCTION SECTION 1 DRESSTA OM515C520C99 1E SECTION CONTENTS 1 1 Introduction 3 1 2 Serial Numbers 5 ...
Страница 12: ......
Страница 17: ...SECTION 2 SAFETY PRECAUTIONS ...
Страница 19: ......
Страница 37: ...SECTION 3 MACHINE TRANSPORT AND STORAGE ...
Страница 39: ......
Страница 49: ...SECTION 4 OPERATING ...
Страница 51: ......
Страница 55: ...SECTION 4 OPERATING Page 6 OM515C520C99 1E DRESSTA UNIVERSAL SYMBOLS FOR INSTRUMENTS AND CONTROLS ...
Страница 107: ...SECTION 5 MAINTENANCE ...
Страница 165: ...SECTION 6 SPECIFICATIONS ...
Страница 167: ......
Страница 181: ...SECTION 6 SPECIFICATIONS Page 16 OM515C520C99 1E DRESSTA WIRING DIAGRAMS ...
Страница 182: ...SPECIFICATIONS SECTION 6 Page 17 DRESSTA OM515C520C99 1E WIRING DIAGRAMS ...
Страница 187: ...SECTION 6 SPECIFICATIONS Page 22 OM515C520C99 1E DRESSTA WIRING DIAGRAMS ...
Страница 192: ...SPECIFICATIONS SECTION 6 Page 27 DRESSTA OM515C520C99 1E SPECIFICATIONS Fig 6 10A Overall Dimensions Wheel Loader 520C ...