System Configuration
SiAU18-715
166
Operation Manual
1. System Configuration
1.1
Operation Instructions
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание E Series
Страница 1: ...SiAU18 715 Applied Models Super Multi Plus Cooling Only Super Multi Plus Heat Pump E Series ...
Страница 26: ...SiAU18 715 Specifications 13 Part 2 Specifications 1 Specifications 14 1 1 Cooling Only 14 1 2 Heat Pump 23 ...
Страница 87: ...Refrigerant Flow for Each Operation Mode SiAU18 715 74 Refrigerant Circuit ...
Страница 139: ...Indoor Unit SkyAir Models SiAU18 715 126 Function ...
Страница 177: ...Test Operation and Field Setting for RA Indoor Unit SiAU18 715 164 Test Operation ...
Страница 299: ...Instruction SiAU18 715 286 Operation Manual 2 6 Ceiling Suspended Type ...
Страница 326: ...SiAU18 715 Service Check Function Troubleshooting 313 ...
Страница 423: ...Method of Replacing The Inverter s Power Transistors Modules SiAU18 715 410 Troubleshooting ...
Страница 443: ...Wiring Diagrams SiAU18 715 430 Appendix ...
Страница 449: ...SiAU18 715 vi Index ...