CyberOptics Corporation
95
Conveyor Components
7. Remove all the five M5 nuts on the top of the edge guide.
Figure 46.
Screws on top of edge guide
8. Replace with a new edge guide.
9. Replace the five M5 nuts and spring.
10. Replace the two screws located at the blade holder using Allen key No. 2.5.
11. Turn the right-hand lock plate at the front clamp assembly in a counter clockwise direction.
Turn the left-hand lock plate in a clockwise direction.
12. Apply threadlocking to the screws after unlocking to ensure the rigidity of the clamp
assembly.
13. Using steps 10–11 of the procedure for replacing the conveyor belt. Refer to the section
➢
To replace the edge guide at rear clamp assembly
1. Remove the five screws on the edge guide.
2. Replace with a new edge guide.
3. Use steps 9–13 to reassemble the top clamp.
M5 nuts x 5
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...