Chapter 2
:
Installation
36
SE500
ULTRA
Hardware Manual
Turning on System Power
CyberOptics recommends a 30 minute warm up time to ensure the most accurate system
measurements.
➢
To turn on the system
1. Check to make sure the conveyor is clear of panels and the E-Stop button is engaged.
2. Turn the main AC circuit breaker to ON to turn on power to the entire system.
The breaker is located on the rear electronics panel.
3. Turn on the power switch on the front of the system.
4. Release the E-Stop button.
5. Press the green start button to restart.
Figure 22.
Main AC Circuit Breaker Location
i
Note:
The computer will start automatically.
i
Note:
Do not run any Solder Paste Inspection applications until after the lights on the signal
light pole have turned on and then off. When you first start the SE500
ULTRA
, the internal
processor initializes the system. After approximately two minutes the lights turn on, and then
several seconds later they turn off, indicating that the initialization is complete. Also, there is a
need to wait for the sensor light to turn ON.
Main AC circuit breaker (Circuit Breaker 1)
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...