Chapter 3
:
Replacing Components and Preventive Maintenance
124
SE500
ULTRA
Hardware Manual
Gantry Components
This section contains procedures for replacing and maintenance of the following gantry
components:
●
Gantry Forcer
●
Gantry Stator
●
X-Axis
●
Encoder
Replacing the Gantry Forcer
Use this procedure to replace the forcer on the left or right side of the gantry. This procedure can
be performed with access to the left/right of the machine in production line. This section shows
the procedure performed when the machine is not in production line.
Parts
Forcer
Required Tools
–
1.4 mm spacer
–
Threadlock Sealant
Caution:
Turn the AC main circuit breaker to OFF to shut down all electrical power to the
SE500
ULTRA
unit before replacing any parts or components. For more information, refer to the
section “
i
Note:
For Parts Replacement, contact CyberOptics for part numbers.
Caution:
Remove the stator first before replacing the forcer. Since the stator has a very strong
magnetic attractive force. For safety reasons, place each stator in an ironless container separately.
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...