Chapter 2
:
Installation
22
SE500
ULTRA
Hardware Manual
Packing the SE500
ULTRA
These instructions describe how to pack the SE500
ULTRA
in its original wooden shipping crate
for shipment. It is recommended to save the shipping crate and all of the packing materials in
case you need to ship the SE500
ULTRA
back to CyberOptics.
Performing this procedure requires a drill with a 13 mm socket attachment, hex head bolts, a
forklift, and a pallet jack. Capacity of forklift: (1060 kg, 185 cm).
➢
To prepare the crate base
1. Prepare the crate base as shown.
Required Tools
Warning:
Only CyberOptics’ service personnels shall perform the installation procedures in
this Chapter.
Warning:
Make sure the SE500
ULTRA
power and AC main circuit breaker is off before packing.
Perform visual inspection of the machine for any dirt or damages before crating.
13 mm socket attachment
Hex head bolt
Accessory
Compartment
Floaters
Sponge
Crate Panels
Содержание SE500ULTRA
Страница 1: ...SE500ULTRA Hardware Manual ...
Страница 6: ...Contents vi SE500ULTRA Hardware Manual ...
Страница 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Страница 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Страница 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Страница 163: ...CyberOptics Corporation 153 AC and DC Distribution Block Diagram AC and DC Distribution Block Diagram ...
Страница 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...