Programming
22
21
CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Typical Commercial Setup
Setting up the GBE for a commercial installation requires a few additional steps. Follow the outline below to
make sure everything is covered.
1) Run the first time setup (see pages 24 to 27)
2) Set up accessories (see pages 33) This includes:
•
Water Meter (remember to set K Factor)
•
Aqua-Sensor
•
Aux In
•
Aux Outs (needed for multi-tank, brine reclaim and refill on 4-cycle valves)
•
Smart Brine Tank Sensor
•
Wireless Remote
•
Modem
•
Service Phone
•
External Filter
3) You must tell the controller if it is a multi-tank system. This is under Advanced Setup/System Setup (see
pages 29). The MultiTank System setting is set to PROG FLOW for ALL multi-tank systems. Trip point
settings will determine how unit operates (progressive, parallel or alternating - page 42).
4) If you are using immediate regeneration, you must change the Reserve Capacity setting under Advanced
Setup/REGEN SETUP and the REGEN MODE. See pages 30.
5) Set/Review Cycle Times – This is under Advanced Setup/Cylce Times. Especially check the Brine Draw/
Slow Rinse (BD/RINSE) and the Fast Rinse. 5-cycle valves have separate refill. See pages 31.
6)
You need to do this setup procedure on each control in the system.
You may want to write down
the settings you change.
7) Refer to Appendix D for a quick programming chart.
Programming
Содержание GBE
Страница 62: ...Menu Overview Continued on page 61 59 CULLIGAN GLOBAL ELECTRONIC CONTROLLER ...
Страница 63: ...Menu Overview Menu Overview 60 ...
Страница 64: ...Menu Overview Continued from page 59 61 CULLIGAN GLOBAL ELECTRONIC CONTROLLER ...
Страница 65: ...Menu Overview Menu Overview 62 ...
Страница 72: ...Appendix D 69 CULLIGAN GLOBAL ELECTRONIC CONTROLLER ...