5
42
CUES Inc.
,
LAMPII User Manual | LM903
www.cuesinc.com
,
FUNCTIONAL CHECKOUT
Power-up the LAMPII as follows:
1. Turn on the lateral PCU.
2. Turn on the K2 system and allow it to boot up.
3. Ensure that LAMPII is selected for the
transporter field (refer to the next page).
FUNCTIONAL CHECKOUT - K2 SUMMIT SYSTEMS
FOR SYSTEMS USING A K2 SUMMIT SYSTEM:
It is important to perform a functional checkout prior to placing the LAMPII in the pipe. The checkout is
designed to uncover possible functional problems while the LAMPII is still on the surface. It is recommended
that one technician view the monitor located inside the TV inspection vehicle to confirm the movements
of the LAMPII while another technician performs the functional checkout. Be sure to follow the proper
instructions for your specific system:1208 PCU or the K2 SUMMIT.
LATERAL
PCU SWITCH
K2 SWITCH
Ensure that all controls are
functioning properly prior to placing
the LAMPII in the pipe!
Содержание LAMP II
Страница 1: ...LAMP II OPERATION MAINTENANCE MANUAL P N LM903 Revision 18 120220 Lateral Mainline Probe II CUES...
Страница 29: ...4 CUES Inc LAMPII User Manual LM903 25 www cuesinc com salesinfo cuesinc com...
Страница 35: ...4 CUES Inc LAMPII User Manual LM903 31 www cuesinc com salesinfo cuesinc com...
Страница 53: ...5 CUES Inc LAMPII User Manual LM903 49 www cuesinc com salesinfo cuesinc com CUES...