V. Condensate Disposal
A. Condensate Trap and Drain Line
1. All condensate which forms in the boiler or vent
system collects in the sump under heat exchanger
and leaves the boiler through factory installed
condensate trap.
2. The trap allows condensate to drain from sump
while retaining flue gases in the boiler. The trap
has factory installed overflow switch, which shuts
down the boiler in the event the drain line becomes
obstructed, preventing proper condensate removal.
Refer to Section XI “Service and Maintenance” for
condensate trap and condensate overflow switch
removal and replacement procedure, if required.
3. Note the following when disposing of the
condensate:
a. Condensate is slightly acidic, typical pH around
3.5 - 4.5. Do not use metallic pipe or fittings in
the condensate drain line. Do not route the drain
line through areas that could be damaged by
leaking condensate.
b. Do not route or terminate the condensate drain
line in areas subject to freezing temperatures.
c. If the point of condensate disposal is above the
trap, a condensate pump is required to move
the condensate to the drain. Select a condensate
pump approved for use with condensing
furnaces. If overflow from the pump would
result in property damage, select a pump with an
overflow switch. Wire this switch in series with
installer provided external high limit, to shut off
the boiler, and, if desired, in series with installer-
supplied alarm, to trigger an alarm in the event
of overflow.
d. Do not attempt to substitute another trap for one
provided with the boiler.
e. In order for boiler to work properly, the boiler
must be leveled during installation.
4. The condensate trap connection is located at
boiler left side, below inlet and outlet water pipe
connections. Refer to Figures 1A, 1B, 1C, 1D and
18.
5. Condensate trap must be filled up with water,
prior to boiler start-up and before connecting any
condensate line to the boiler to insure combustion
products cannot escape from operating boiler. To fill
the trap, inject water in the amount of 1 cup (240ml)
through condensate trap connection. Do not overfill
the trap.
6. Install tee for condensate overflow and vent as
shown in Figure 18.
WARNING
Asphyxiation Hazard. Failure to fill the
condensate trap with water prior to boiler start-
up could cause flue gas to enter the building,
resulting in personal injury or death.
7. If any additional condensate drain line is needed,
construct the extension from PVC or CPVC
Schedule 40 pipe. The factory supplied ¾ in. x 5-5/8
in. long PVC coupling, located in the miscellaneous
parts carton, must be used to connect drain line to
the condensate trap. Do not over tighten coupling
compression nuts when connecting drain line and
condensate trap.
8. Size condensate drain line, pump and neutralizer
(if using other than manufacturer neutralizer kit) to
accommodate maximum condensate flow shown in
Table 12 “Maximum Condensate Flow”.
Table 12: Maximum Condensate Flow
Boiler
Model
*Maximum Condensate Flow,
GPH
PHNTM399
4.5
PHNTM500
5.6
*Assumes 100% of water in fuel condenses.
WARNING
Asphyxiation Hazard. Failure to install the
condensate drain in accordance with the above
instructions could cause flue gas to enter the
building, resulting in personal injury or death.
NOTICE
Boiler condensate is corrosive. Route
condensate drain line in a manner such
that any condensate leakage will not cause
property damage.
Some jurisdictions may require that
condensate be neutralized prior to disposal.
Use materials approved by the authority
having jurisdiction.
B. Condensate Neutralizer Installation
1. Some jurisdictions may require that the condensate
be neutralized before being disposed of. Follow
local codes pertaining to condensate disposal.
Содержание PHNTM399
Страница 6: ...6 I Product Description Specifications and Dimensional Data continued Figure 1A Phantom Model PHNTM399...
Страница 7: ...7 Figure 1B Phantom Model PHNTM500 I Product Description Specifications and Dimensional Data continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Страница 54: ...54 VIII Electrical continued...
Страница 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Страница 63: ...63 IX System Start up continued Phantom Series Operating Instructions Figure 32 Operating Instructions...
Страница 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Страница 118: ...118...
Страница 119: ...119...