![Crown Boiler PHNTM399 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/crown-boiler/phntm399/phntm399_installation-and-operating-instructions-manual_2690652077.webp)
77
X. Operation
E. Boiler Sequence Of Operation (continued)
3. Status Screens (continued)
Bargraph Screen
Bargraph Screen
The bargraph screen presents measured values for easy comparison.
Included on this screen is firing rate and when the Zone Panel is connected
the measure Heat Loss. Measured heat loss is the heat rate kbtu/hr sum of
all active (call for heat) zones. This value represents the maximum required
firing rate.
Data Logging
Real time graphic trends allow users to observe process changes over
time providing valuable diagnostic information. For example, flame
current performance over start up periods and varying loads can be an
indication of gas supply issues. Additionally, supply and return tempera-
ture dual pen trends brings a focused look at heat exchanger and pump
performance. For example, studying a differential temperature trend may
indicate pump speed settings need to be changed.
Trend Screens
NOTE
Firing Rate Trend shows fan demand and
feedback.
Burner Status Screen
Cycles and Hours
Boiler cycles and hours are used to moni
-
tor the boilers overall compatibility to the
heating load. Excessive cycling compared
to run time house may be an indication of
pumping, boiler sizing or adjustment issues.
NOTE
“Boiler Cycle” and “Run Time Hours” are
resettable by selecting the “Reset Counts”
button located on the information screen.
The “Controller Cycles” and “Control
-
ler Run Time” data is not resettable and
remains for the life of the control.
Содержание PHNTM399
Страница 6: ...6 I Product Description Specifications and Dimensional Data continued Figure 1A Phantom Model PHNTM399...
Страница 7: ...7 Figure 1B Phantom Model PHNTM500 I Product Description Specifications and Dimensional Data continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Страница 54: ...54 VIII Electrical continued...
Страница 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Страница 63: ...63 IX System Start up continued Phantom Series Operating Instructions Figure 32 Operating Instructions...
Страница 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Страница 118: ...118...
Страница 119: ...119...