8
I. Product Description, Specifications and Dimensional Data
(continued)
Table 2: Ratings
Phantom Series Gas-Fired Boilers
Model
Number
Input (MBH)
Gross Output
(MBH)
Net Ratings Water
1
(MBH)
Thermal
Efficiency (%)
Combustion
Efficiency (%)
Min.
Max.
PHNTM399
80
399
375
326
94.1
94.5
PHNTM500
100
500
475
413
95.0
95.0
Ratings shown are for installations at sea level and elevations up to 2000 ft. For elevations above 2000 ft., the boiler will naturally
derate by 2.5% for each 1000 ft. above sea level.
1
Net AHRI Water Ratings based on piping and pickup allowance of 1.15. Consult manufacturer before selecting boiler for
installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc.
The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup requirements,
such as intermittent system operation, extensive piping systems, etc.
II. Unpacking Boiler
NOTICE
Do not drop boiler.
A. Move boiler
to approximate installed position.
B. Remove all
crate fasteners.
C. Lift and remove
outside container.
D. Remove boiler
from cardboard positioning sleeve
on shipping skid.
E. Move boiler
to its permanent location.
Содержание PHNTM399
Страница 6: ...6 I Product Description Specifications and Dimensional Data continued Figure 1A Phantom Model PHNTM399...
Страница 7: ...7 Figure 1B Phantom Model PHNTM500 I Product Description Specifications and Dimensional Data continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Страница 54: ...54 VIII Electrical continued...
Страница 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Страница 63: ...63 IX System Start up continued Phantom Series Operating Instructions Figure 32 Operating Instructions...
Страница 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Страница 118: ...118...
Страница 119: ...119...