F. Multiple Boiler Installation Venting
1. Vent Piping and Terminations
a. Multiple boiler vent terminations are shown in
Figure 17.
b. Each individual boiler must have its own vent
pipe and vent terminal. Refer to Paragraphs A
through E (as applicable) for individual boiler
vent guidelines and options.
WARNING
Asphyxiation Hazard. No common manifold
venting (vent piping and vent terminals) is
permitted.
c. Do not exceed the individual boiler maximum
vent length listed in Table 5.
d. For horizontal sidewall terminations, maintain
at least 12 in. (300 mm) minimum horizontal
distance between any adjacent individual boiler
vent terminations. Additional horizontal spacing
between any adjacent individual boiler vent
terminations as well as extending the distance
from building surfaces to vent termination end
are recommended to avoid frost damage to
building surfaces where vent terminations are
placed.
NOTICE
Installing multiple individual boiler vent
terminations too close together may result in
combustion product water vapor condensation
on building surfaces, where vent terminations
are placed, and subsequent frost damage.
To avoid/minimize frost damage, extend
the distance from building surfaces to vent
termination end and increase the horizontal
distance between adjacent vent terminations.
e. Individual boiler sidewall vent terminals must be
placed at least 12 in. (300 mm) [18 in. (460 mm)
in Canada] above the ground plus the expected
snow accumulation.
f. Multiple individual boiler vertical vent pipes
may be piped through a common conduit or
chase so that one roof penetration may be made.
g. For vertical roof terminations, maintain at
least 12 in. (300 mm) minimum horizontal
distance between adjacent individual boiler vent
terminations.
IV. Venting
F. Multiple Boiler Installation Venting (continued)
2. Combustion Air Piping
a. Multiple boiler combustion air terminations are
shown in Figure 17.
b. Each individual boiler must have own
combustion air pipe and terminal. Refer to
Paragraphs A through E (as applicable) for
individual boiler combustion air guidelines and
options.
c. Do not exceed the individual boiler maximum
combustion air pipe length listed in Table 5.
d. If possible, locate vent and combustion air
terminals for an individual boiler on the same
wall to prevent nuisance shutdowns. If not,
an individual boiler may be installed with a
roof vent terminal and sidewall combustion air
terminal.
Содержание PHNTM399
Страница 6: ...6 I Product Description Specifications and Dimensional Data continued Figure 1A Phantom Model PHNTM399...
Страница 7: ...7 Figure 1B Phantom Model PHNTM500 I Product Description Specifications and Dimensional Data continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Страница 54: ...54 VIII Electrical continued...
Страница 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Страница 63: ...63 IX System Start up continued Phantom Series Operating Instructions Figure 32 Operating Instructions...
Страница 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Страница 118: ...118...
Страница 119: ...119...