2. Install close nipple into tee branch. Then, screw
the assembly into boiler left side front ¾ in.
FPT tapping, making sure tee run outlets are in
vertical plane and parallel to boiler side.
3. Install the ¾ in. NPT x 10 in. black nipple into
tee run top outlet.
4. Mount ¾ in. FPT x ¾ in. FPT safety relief
valve onto 10 in. nipple.
5. Install drain valve into tee bottom outlet.
6. Locate and remove (2) 1½ in. NPT x 2 in. long
black nipples, 1½ in. x 1½ in. x ¾ in. NPT
black tee, 1½ in. x 1½ in. x 1 in. NPT black
tee, packaged flow switch with paddles, ¾
in. x ¼ in. NPT black reducing bushing and
temperature & pressure gauge.
A. Installation of Factory Supplied Piping and
Trim Components
Phantom boilers have factory supplied Miscellaneous
Parts Carton, which includes packaged flow switch with
two boiler-specific paddles, supply piping components,
gas piping components, temperature & pressure gauge,
safety relief valve and drain valve. See Figure 19
“Factory Supplied Piping and Trim Installation”.
Install these components prior to connecting boiler
to system piping as follows:
1. Locate and remove ¾ in. NPT x close black
nipple, ¾ in. NPT x 10 in. black nipple, ¾ in.
NPT black tee, ¾ in. FPT x ¾ in. FPT safety
relief valve and ¾ in. NPT drain valve.
VI. Water Piping and Trim
Figure 19: Factory Supplied Piping and Trim Installation
NOTICE
Failure to properly pipe boiler may result in improper operation and damage to boiler or structure.
Install boiler so that the gas ignition system components are protected from water (dripping, spraying,
rain, etc.) during appliance operation and service (circulator replacement, etc.).
Oxygen contamination of boiler water will cause corrosion of iron and steel boiler components, and
can lead to boiler failure. Crown Boiler Company’ s Standard Warranty does not cover problems
caused by oxygen contamination of boiler water or scale (lime) build-up caused by frequent addition of
water.
Do not fill boiler with softened water to prevent chloride contamination.
Installation is not complete unless a safety relief valve is installed into the tapping located on left side
of appliance or the supply piping.
Notice: Required near boiler
piping (“boiler loop piping”)
size may be larger than piping/
trim supplied with boiler. See
Table 14. If larger piping is
required, increase size directly
after supplied trim.
Содержание PHNTM399
Страница 6: ...6 I Product Description Specifications and Dimensional Data continued Figure 1A Phantom Model PHNTM399...
Страница 7: ...7 Figure 1B Phantom Model PHNTM500 I Product Description Specifications and Dimensional Data continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Страница 54: ...54 VIII Electrical continued...
Страница 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Страница 63: ...63 IX System Start up continued Phantom Series Operating Instructions Figure 32 Operating Instructions...
Страница 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Страница 118: ...118...
Страница 119: ...119...