Commissioning
6
6.1 TESTING
Full alarm test
Where possible a full alarm test should be conducted to check that all inputs, outputs and wiring
connections to the Smoke Screen are correct. If a PIR or other detector is fitted the Smoke Screen will fire
for the designated Smoke Time period once the ‘Set’, ‘Trigger’ and ‘Hold Off’ (if fitted) contacts are open. It
will stop producing smoke if the ‘Set’ contacts are closed.
32
Содержание TITANIUM Ti100
Страница 1: ...TITANIUM Ti70 Ti100 Ti150 INSTALLATION AND OPERATION MANUAL VERSION 28 November 2019 ...
Страница 15: ...Titanium Generic Connection Schematic PCB v2 15 ...
Страница 37: ...8 2 INSTALLER NOTES 37 ...
Страница 39: ...39 ...