The Running hours equalization function compares RHE value of each controller in the group. Once the
difference between RHE of individual controllers is higher than
#Run Hours Max Difference (page 200)
(i.e.
Hours Max Difference (page 200)
+ 1), the gen-set(s) with the lowest RHE is/are started.
Example:
The system structure and its settings is shown on the figure below.
Image 5.22 Example of the system
3 cases are considered:
Case #1: 2 gen-gets available
Case #2: 3 gen-gets available with same initial RHE.
Case #3: 3 gen-gets available with different initial RHE.
Case #1:
Gen-set 1 running hours = 250 -> running hours considered in RHE = 100 (150 -
Gen-set 2 running hours = 450 -> running hours considered in RHE = 200 (250 -
Both gen-sets have the same nominal power of 700 kW. Originally, priority of gen-sets was G1 = 2, G2 = 1.
Load demand in this example is constant and it is 500 kW (i.e. only one engine is running at any time). In this
case, the controllers set the engine priority of the gen-set 1 to 1 because it has the lowest considered RHE and
the difference between RHE2 (i.e. considered RHE of gen-set 2) and RHE1 is higher than
that is set to 10h.
Run hours
#RunHoursBase
RHE
Gen-set #1
250
150
100
Gen-set #2
450
250
200
The gen-set 1 runs for 100 hours to equalize the RHE of both gen-sets. The gen-set 1 keeps running until the
difference between RHE1 and RHE2 exceeds
#Run Hours Max Difference (page 200)
(i.e. 10h). The gen-set 1
runs 100 +
#Run Hours Max Difference (page 200)
+ 1 = 100 + 10 + 1 = 111 hours. After 111 hours the gen-sets 2
has the lowest RHE and the difference between RHE1 and RHE2 is higher than
. The gen-set 2 runs 11 hours to equalize the RHE of both gen-sets and then additional
+ 1 hours (i.e. 11 + 10 + 1 = 22 hours). The evolution of RHE1 and RHE2 is shown on
the figure below.
Содержание InteliMains 210 BTB
Страница 169: ...PLC Setpoint 61 360 PLC Setpoint 62 361 PLC Setpoint 63 362 PLC Setpoint 64 363 InteliMains 210 Global Guide 169 ...
Страница 366: ...Log Bout 6 385 Log Bout 7 386 Date Time Time 394 Date 394 InteliMains 210 Global Guide 366 ...
Страница 494: ...InteliMains 210 Global Guide 494 Image 8 144 Configuration of OR AND block 6 back to List of PLC blocks ...