3
Packaging
You have received four or five pallets with parts
and components, depending on whether you have
ordered the optional cosmetic wall.
The pallets are marked with
A
,
B
,
C
,
D
, and
E
.
During installation, you need parts from pallet
A
first.
This installation guide is on pallet
A
, the wiring
diagram and other information from us are on
pallet
C
.
Wall structure pallet
Cavities pallet
Component pallet
Display pallet
Cosmetic wall pallet
(optional)
Boxes and labels
There are several boxes with parts on each pallet.
The boxes are marked with a letter followed by
a number. The letter identifies the pallet. For
example
A1
,
A2
,
A3
, ... for the boxes on pallet
A
.
In general, you need box
A1
before box
A2
, and
so on. But you don't always need
all
the parts
contained in a box or pallet with a lower number
before you need parts from the next.
The installation guide refers to these labels to
show where the required parts for each step are.
4x
subwoofer stands
4x
subwoofers
4x
50 × 50 mm (2 × 2 in.) piece of foam
A5
C1
A6
Example from installation guide
A
B
C
D
E
Содержание Webex Room Panorama
Страница 1: ...Cisco Webex Room Panorama Installation guide ...
Страница 2: ......
Страница 24: ...22 7 2 Mount the amplifier Slide the amplifier into its slot Fasten it with four screws M5x10 Torx 25 2 ...
Страница 83: ...81 ...
Страница 87: ......