14
4
Mount the cavities
Cavities
The system has six cavities, which are designed
for mounting the two main screens and the
equipment behind them.
A cavity fits between two vertical risers. It hangs
on the risers, and is secured with four screws.
We recommend you to insert the cavities close to
the center first, and the display cavities last.
1x
rack cavity
2x
power cavity
1x
cooling cavity
2x
display cavity
24x
(M6x12, Torx 30)
Hang the cavity between the two risers as shown
in the illustration. Check that the hooks fully enter
all slots on both sides (see details on the next
page).
The top of the cavity aligns with the setback of the
center riser.
4.1 Insert the rack cavity
B3
B5
B4
B6
B7
1.0 m
(39.4 in.)
Side view
Содержание Webex Room Panorama
Страница 1: ...Cisco Webex Room Panorama Installation guide ...
Страница 2: ......
Страница 24: ...22 7 2 Mount the amplifier Slide the amplifier into its slot Fasten it with four screws M5x10 Torx 25 2 ...
Страница 83: ...81 ...
Страница 87: ......