1-36
Cisco ONS 15600 SDH Troubleshooting Guide, R8.0
July 2010
Chapter 1 General Troubleshooting
1.3.3 Create a Facility Loopback on an Intermediate-Node Ethernet Port
d.
In the next Circuit Creation dialog box, give the circuit an easily identifiable name such as
Eth1toEth3.
e.
Leave the Bidirectional check box checked.
f.
Click
Next
.
g.
In the Circuit Creation source dialog box, select the same Node, card Slot, Port, and VC where the
test set is connected.
h.
Click
Next
.
i.
In the Circuit Creation destination dialog box, use the same Node, card Slot, Port, and VC used for
the source dialog box.
j.
Click
Next
.
k.
In the Circuit Creation circuit routing preferences dialog box, leave all defaults. Click
Finish
.
Step 4
Confirm that the newly created circuit appears on the Circuits tab list as a two-way circuit.
Note
It is normal for the
“LPBKFACILITY (GIGE)” condition on page 2-88
to appear during a
loopback setup. The condition clears when you remove the loopback.
Step 5
Create the facility loopback on the destination port being tested:
a.
Go to the node view of the intermediate node:
•
Choose
View
>
Go To Other Node
from the menu bar.
•
Choose the node from the drop-down list in the Select Node dialog box and click
OK
.
b.
In node view, double-click the intermediate-node card that requires the loopback.
c.
Click the or
Maintenance > Ethernet > Loopback > Port
tabs.
d.
Select
Locked,maintenance
from the Admin State column. If multiple ports are available, select
the row appropriate for the desired port.
e.
Select
Facility
from the Loopback Type column. If multiple ports are available, select the row
appropriate for the desired port.
f.
Click
Apply
.
g.
Click
Yes
in the confirmation dialog box.
Step 6
Complete the
“Test and Clear the Ethernet Facility Loopback Circuit” procedure on page 1-36
.
Test and Clear the Ethernet Facility Loopback Circuit
Step 1
If the test set is not already sending traffic, send test traffic on the loopback circuit.
Step 2
Examine the traffic received by the test set. Look for errors or any other signal information that the test
set is capable of indicating.
Step 3
If the test set indicates a good circuit, no further testing is necessary with the facility loopback. Clear the
facility loopback from the port:
a.
Click the
Maintenance > Ethernet > Loopback > Port
tabs.
b.
Choose
None
from the Loopback Type column for the port being tested.
Содержание Cisco ONS 15600 SDH
Страница 18: ...Contents xviii Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 ...
Страница 20: ...Figures xx Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 ...
Страница 30: ...xxx Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 About this Guide ...
Страница 256: ...3 8 Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 Chapter 3 Transient Conditions 3 3 28 WKSWPR ...
Страница 306: ...4 50 Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 Chapter 4 Error Messages ...
Страница 318: ...Index IN 12 Cisco ONS 15600 SDH Troubleshooting Guide R8 0 July 2010 ...