C H A P T E R 6
Cabling the Switch Processor Input/Output Line Card
T1 3-Pin BITS Interface Version
Connecting to the Management LAN
Using the Ethernet RJ-45 Interfaces
Connecting to the Serial Console Port
Connecting to the Console Port
Connecting to a BITS Timing Source
Connecting to the CO Alarm Interface
Central Office Alarm Wiring Example
C H A P T E R 7
Cabling the Fast Ethernet (10/100) Line Card
C H A P T E R 8
Cabling the Gigabit Ethernet Line Cards
Gigabit Ethernet Line Card (GLC2)
Quad Gigabit Ethernet Line Card (QGLC)
Cabling the Optical SFP+ Interface
10 Gigabit Ethernet Line Card (XGLC)
Cabling the Optical SFP+ Interface
C H A P T E R 9
Cabling the Optical (ATM) Line Cards
Optical (ATM) Line Card Interfaces
Cabling the Optical SFP Interface
ASR 5000 Installation Guide
vi
Contents
Содержание ASR 5000
Страница 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Страница 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Страница 118: ...ASR 5000 Installation Guide 102 Cabling the Switch Processor Input Output Line Card Central Office Alarm Wiring Example ...
Страница 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Страница 136: ...ASR 5000 Installation Guide 120 Cabling the Optical ATM Line Cards Cabling the Optical SFP Interface ...
Страница 140: ...ASR 5000 Installation Guide 124 Cabling the Channelized Line Cards Cabling the Optical SFP Interface ...
Страница 144: ...Figure 49 PFU Wiring Diagram ASR 5000 Installation Guide 128 Cabling the Power Filter Units Power Cable Requirements ...
Страница 148: ...ASR 5000 Installation Guide 132 Cabling the Power Filter Units Connecting the PFU to the Power Source ...
Страница 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Страница 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Страница 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Страница 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Страница 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...
Страница 280: ...ASR 5000 Installation Guide 264 Preparing a Full Height Line Card Slot Remove the Half Height Card Guide ...
Страница 294: ...ASR 5000 Installation Guide 278 Spare Component Recommendations Spare Component Recommendations ...