External BITS timing is an alternative to using clock signals derived from an ATM port on an OLC2, or
an ANSI SONET STS-3/SDH STM-1 port on a CLC2. (Line-derived clocking requires that the SPIO be
equipped with the optional Stratum 3 clock module.) For additional information, refer to the
ATM Port
Configuration Mode Commands
and
Channelized Port Configuration Mode Commands
chapters of the
Command Line Interface Reference
.
Important
Always refer to the interface and signaling specifications in the OEM documentation supplied with the
BITS source. Your NOC may also have detailed specifications for distributing the BITS clock signals to
network devices such as the ASR 5000.
Important
BITS E1 BNC Interface
The BNC version of the SPIO employs a 75-ohm coaxial BNC connector that accepts an analog E1 BITS
signal. The following figure shows the BITS BNC timing interface.
Figure 36: SPIO E1 BITS BNC Pinout
Use 75-ohm coaxial cable (RG-59/U) between the BITS and the SPIO BNC interface to carry the E1 signal.At
the SPIO, terminate the cable with a 75-ohm BNC male connector.
BITS T1 3-Pin Interface
The 3-pin version of the SPIO employs a wire-wrap connector that accepts a T1 (DS1) BITS data signal (all
ones). The following figure shows the BITS timing interface wire-wrap pin-out.
Figure 37: SPIO T1 BITS Wire-Wrap Pinout
Use 22 AWG, twisted-pair, 100-ohm shielded cable between the BITS and SPIO wire-wrap interface to carry
the DS1 signal.
ASR 5000 Installation Guide
96
Cabling the Switch Processor Input/Output Line Card
BITS E1 BNC Interface
Содержание ASR 5000
Страница 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Страница 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Страница 118: ...ASR 5000 Installation Guide 102 Cabling the Switch Processor Input Output Line Card Central Office Alarm Wiring Example ...
Страница 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Страница 136: ...ASR 5000 Installation Guide 120 Cabling the Optical ATM Line Cards Cabling the Optical SFP Interface ...
Страница 140: ...ASR 5000 Installation Guide 124 Cabling the Channelized Line Cards Cabling the Optical SFP Interface ...
Страница 144: ...Figure 49 PFU Wiring Diagram ASR 5000 Installation Guide 128 Cabling the Power Filter Units Power Cable Requirements ...
Страница 148: ...ASR 5000 Installation Guide 132 Cabling the Power Filter Units Connecting the PFU to the Power Source ...
Страница 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Страница 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Страница 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Страница 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Страница 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...
Страница 280: ...ASR 5000 Installation Guide 264 Preparing a Full Height Line Card Slot Remove the Half Height Card Guide ...
Страница 294: ...ASR 5000 Installation Guide 278 Spare Component Recommendations Spare Component Recommendations ...