Table 10: RCC Callouts
Description
Item
Card Ejector Levers
—
Use to insert/remove a card to and from the chassis.
1
Interlock Switch
—
In its Down position the interlock switch notifies the system to safely power
down the card prior to its removal.
2
Card Level Status LEDs
—
Show the status of the card.
3
Fast Ethernet Line Card (FLC2)
The FLC2 installs directly behind its respective packet processing card, providing network connectivity to
the RAN interface and the packet data network. Each FLC2 (Ethernet 10/100) has eight RJ-45 interfaces.
Each of these IEEE 802.3-compliant interfaces supports auto-sensing 10/100 Mbps Ethernet. Allowable
cabling includes:
The FELC has reached its end of life and is no longer available for purchase. It has been replaced by the
FLC2.
Important
•
100Base-Tx
—
full or half duplex Ethernet on CAT 5 shielded twisted pair (STP) or unshielded twisted
pair (UTP) cable
•
10Base-T
—
full or half duplex Ethernet on CAT 3, 4, or 5 STP or UTP cable
Use shielded cabling whenever possible to further protect the chassis and its installed components from
ESD or other transient voltage damage.
Important
The FLC2 supports the Star Channel (1 Gbps) for faster FPGA upgrades and is Restriction of Hazardous
Substances (RoHS) 6/6 compliant.
The FLC2 can be installed in chassis slots 17 through 23, 26 through 39, and 42 through 48. These cards are
always installed directly behind their respective packet processing cards, but are not required to be placed
behind any redundant packet processing cards (those operating in Standby mode).
ASR 5000 Installation Guide
24
ASR 5000 Hardware Platform Overview
Fast Ethernet Line Card (FLC2)
Содержание ASR 5000
Страница 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Страница 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Страница 118: ...ASR 5000 Installation Guide 102 Cabling the Switch Processor Input Output Line Card Central Office Alarm Wiring Example ...
Страница 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Страница 136: ...ASR 5000 Installation Guide 120 Cabling the Optical ATM Line Cards Cabling the Optical SFP Interface ...
Страница 140: ...ASR 5000 Installation Guide 124 Cabling the Channelized Line Cards Cabling the Optical SFP Interface ...
Страница 144: ...Figure 49 PFU Wiring Diagram ASR 5000 Installation Guide 128 Cabling the Power Filter Units Power Cable Requirements ...
Страница 148: ...ASR 5000 Installation Guide 132 Cabling the Power Filter Units Connecting the PFU to the Power Source ...
Страница 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Страница 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Страница 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Страница 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Страница 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...
Страница 280: ...ASR 5000 Installation Guide 264 Preparing a Full Height Line Card Slot Remove the Half Height Card Guide ...
Страница 294: ...ASR 5000 Installation Guide 278 Spare Component Recommendations Spare Component Recommendations ...