- 26 -
6-5.
Operation screen and setting screen
Relation between operation screen and settings screen is as follows.
[Operation screen of output 1] [Mode screen of mode 0]
[Operation screen of output 2] [Settings screen of time and SV that is being executed]
Ú
Displayed only for output 2 specifications.
[Operation screen of time display]
[Operation screen of program overall display]
[Operation screen of output 1]
①
When power is supplied and after initial message is displayed first of all the operation screen is
displayed.
②
In the settings screen if no key operation is done for around three minutes or more, it automatically
returns to the operation screen.
However, for 'auto tuning' settings screen of mode 1, when auto tuning is executing etc., it may
sometimes not return to the automatic operation screen.
③
Operation screen displayed lastly (either of output display screen, time display screen, or program
pattern overall display screen) is stored and that operation screen is displayed after returning from
power supply insertion or settings screen.
Operation screen
Setting screen
・・・
・・・
Содержание KP 2000 Series
Страница 1: ...INST No INE 809A Digital Program Controller KP2000 General ...
Страница 2: ......
Страница 143: ......