30
Slave Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Slave boiler lead lag setup
1)
Place both toggle switches in
LOCAL
2)
Press
and select Login
3)
Select Advanced Setup
4)
Select
System
5)
Select
System ID & Access
6)
Select
MB1 Modbus address = 2
. To be in sequential order
7)
Select
MB2 Modbus address = 2
. To be in sequential order
8)
Select
Lead Lag Config
9)
Select
Lead Lag Slave Config
10)
Select
Slave enable = Enabled via SOLA master,
and Press
Содержание DynaMax DMH081
Страница 2: ......
Страница 12: ...7 Figure 5 DynaMax HS Wall Hung Service Clearances Figure 6 DynaMax HS Floor Mount Service Clearances...
Страница 68: ...65 PART 14 EXPLODED VIEW PARTS LIST DYNAMAX HS WALL HUNG...
Страница 69: ...66 DYNAMAX HS FLOOR MOUNT...
Страница 76: ...73 PART 15 ELECTRICAL DIAGRAMS 15 1 DM 80 299 INTERNAL WIRING DIAGRAM...
Страница 77: ...74 15 2 DM 399 800 INTERNAL WIRING DIAGRAM...
Страница 78: ...75...