RIVER IDROTECH 18 - 24 - 24H2O
2
SUMMARY
1 MANUAL SIMBOLOGY ....................................2
2 PACKAGING AND HANDLING ..........................2
2.1 PACKAGING .............................................................2
2.2 PREPARATION AND UNPACKING .............................2
2.3 STOVE HANDLING....................................................4
3 CHIMNEY FLUE .............................................4
3.1 PREPARING THE SMOKE EXPULSION SYSTEM .........4
3.2 CHIMNEY COMPONENTS .........................................4
3.3 SMOKE DUCT (SMOKE FITTING) ..............................5
3.4 FLUE (CHIMNEY OR PIPED DUCT) ...........................5
3.5 CHIMNEY POT ..........................................................6
3.6 MAINTENANCE ........................................................7
4 COMBUSTION AIR .........................................7
4.1 AIR INLET ................................................................7
4.2 COMBUSTIBLE AIR INLET FOR SEALED-CHAMBER
INSTALLATION ...................................................................8
5 EXAMPLES OF INSTALLATION (DIAMETERS AND
LENGTHS TO BE SIZED) ........................................9
6 INSTALLATION ............................................10
6.1 INTRODUCTION .....................................................10
6.2 MINIMUM DISTANCES ...........................................11
6.3 OVERALL DIMENSIONS .........................................12
6.4 STOVE DOOR REMOVAL/INSTALLATION ................12
6.5 FITTING THE METAL FRAME OF RIVER- IDROTECH 18 -
24 - 24 H
O .......................................................................13
6.6 ASSEMBLING THE TOP CLADDING AND BOTTOM
DOOR ..............................................................................13
6.7 FITTING THE MAIOLICA FRAME OF RIVER- IDROTECH
18 - 24 - 24 H
O ................................................................14
6.8 ELECTRIC CONNECTION .........................................14
6.9 STOVE CALIBRATION AND DEPRESSION
MEASUREMENT ...............................................................15
7 PLUMBING CONNECTION.............................16
7.1 PLUMBING SYSTEM CONNECTION.........................16
7.2 CONNECTION DIAGRAM RIVER - IDROTECH 18 - 24
(SENZA DHW) ..................................................................16
7.3 CONNECTION DIAGRAM RIVER - IDROTECH 24 H
DHW ..............................................................................17
7.4 3 BAR DISCHARGE VALVE ......................................17
7.5 WASHING THE SYSTEM .........................................18
7.6 FILLING THE SYSTEM .............................................18
7.7 WATER CHARACTERISTICS ....................................19
7.8 SYSTEM CONFIGURATION .....................................19
7.9 CONFIGURATION 1.................................................19
7.9.1 SYSTEM WITH: DIRECT PELLET STOVE AND ROOM
PROBE OR EXTERNAL THERMOSTAT** (OPTIONAL) ...........19
7.10 CONFIGURATION 2.................................................21
7.11 CONFIGURATION 3.................................................23
7.12 CONFIGURATION 4.................................................25
7.13 CONFIGURATION 5.................................................26
7.14 CONFIGURATION WITH STORAGE TANK AND
AUXILIARY WALL-MOUNTED BOILER (EXAMPLE) ...........27
7.15 OPERATING MODE .................................................28
7.16 ELECTRICAL CONNECTIONS ...................................29
8 SPECIAL MAINTENANCE ..............................30
8.1 INTRODUCTION .....................................................30
8.2 DIRTY GLASS .........................................................30
8.3 FUME CONDUIT CLEANING ....................................31
8.4 SMOKE EXTRACTOR COMPARTMENT CLEANING ...31
8.5 CLEANING THE SMOKE EXTRACTION SYSTEM AND
GENERAL CHECKS ............................................................31
8.6 DOOR CLOSING FUNCTIONALITY PERIODIC CHECK 32
8.7 FUME PASSAGES CLEANING ..................................32
8.8 CLEANER BLOCKED ................................................33
8.9 REPLACING THE OVERPRESSURE RELIEF VALVE FOR
THE COMBUSTION CHAMBER ..........................................33
8.10 FUME PIPES ANNUAL CLEANING ..........................34
8.11 GASKET REPLACEMENT .........................................34
9 IN CASE OF ANOMALY ..................................34
9.1 PROBLEM SOLVING ...............................................34
9.2 PROBLEM SOLVING (THERMOSTOVE) ...................38
10 TECHNICAL DATAS ......................................40
10.1 ELECTRONIC BOARD WITHOUT DHW ...................40
10.2 ELECTRONIC BOARD WITH DHW ..........................41
10.3 REPAIR INFORMATION ..........................................44
11 FEATURES ..................................................45
Содержание RIVER IDROTECH 18
Страница 42: ...RIVERIDROTECH18 24 24H2O 42 10 2 ELECTRONIC BOARD WITH DHW Fig 68 ElectricalboardwithDHW ...
Страница 46: ...NOTE ...
Страница 47: ...NOTE ...