RIVER IDROTECH 18 - 24 - 24H2O
5
2.3
STOVE HANDLING
Both whether the stove is packed or not it is necessary to observe the following instructions for handling and transporting the
stove from its sale point to its installation point and for any future movements:
• The stove must be handled with idoneous means paying attention to the existing safety regulations;
• do not turn the stove upside down and/or upset it on one side, but keep it in vertical position or as accorded with the construc-
tor instructions;
• if the stove is made up of ceramic, stone, glass or any particularly fragile material components, all must be moved with the
utmost care.
3
CHIMNEY FLUE
3.1
PREPARING THE SMOKE EXPULSION SYSTEM
The combustion product expulsion system is a particularly important element for the proper operation of the appliance and must
be correctly sized according to EN 13384-1.
Its creation/adaptation/verification must always be carried out by a legally qualified operator and must comply with the regula-
tions in force in the country where the appliance is installed.
The Manufacturer declines all liability for malfunctions caused by a badly sized and non-compliant smoke expulsion system.
3.2
CHIMNEY COMPONENTS
Fig. 5 - Chimney components
LEGEND
1
Chimney pot
2
Fume outlet
3
Chimney flue
4
Termal insulation
5
External wall
6
Chimney union
7
Fume pipe
8
Heat generator
9
Inspection door
10
T-union with inspection plug
Содержание RIVER IDROTECH 18
Страница 42: ...RIVERIDROTECH18 24 24H2O 42 10 2 ELECTRONIC BOARD WITH DHW Fig 68 ElectricalboardwithDHW ...
Страница 46: ...NOTE ...
Страница 47: ...NOTE ...