RIVER IDROTECH 18 - 24 - 24H2O
17
7
PLUMBING CONNECTION
7.1
PLUMBING SYSTEM CONNECTION
IMPORTANT!
If installation of the product involves interaction with another, pre-existing system complete with heating
equipment (gas boiler, methane boiler, diesel boiler, etc.), contact qualified personnel, who subsequently will
be responsible for conformity of the system in compliance with the applicable law in force.
The Company declines all responsibility for damage to persons or things in the event of failed or incorrect
operation, if the aforementioned warnings are not complied with.
IMPORTANT!
WE STRONGLY RECOMMEND WASHING THE ENTIRE SYSTEM BEFORE CONNECTING THE STOVE IN ORDER TO RE-
MOVE RESIDUE AND BUILD-UPS.
Always install gate valves upstream of the stove to isolate it from the hydraulic system should it be necessary
to move it for routine and/or special maintenance. Connect the stove using flexible hoses so as not to excessi-
vely bind the stove to the system and to allow it to be moved slightly.
The pressure discharge valve must always be connected to a water discharge pipe. The pipe must be suitable
to withstand the high water temperature and pressure.
7.2
CONNECTION DIAGRAM RIVER - IDROTECH 18 - 24 (SENZA DHW)
Fig. 34 - Connection diagram (senza DHW)
LEGEND
A1
3/4”M heating water delivery
A2
3/4”M heating water return
A3
System filling
A4
System draining
B=150 - C=260
RIVER-IDROTECH
Содержание RIVER IDROTECH 18
Страница 42: ...RIVERIDROTECH18 24 24H2O 42 10 2 ELECTRONIC BOARD WITH DHW Fig 68 ElectricalboardwithDHW ...
Страница 46: ...NOTE ...
Страница 47: ...NOTE ...