Boiler installation
8
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
41
8.6.4 Strain relief
Secure all cable runs with cable clips (standard control
device delivery):
z
Insert the cable clips together with the cable from the
top into the slots in the frame (step 1).
z
Push the cable clip down (step 2).
z
Push against the clip (step 3).
z
Flick the toggle up (step 4).
8.7
Installing casing parts
z
Locate and secure the control device cover.
z
Fit the rear boiler cover.
Fig. 62 Securing cables with a cable clip
Fig. 63 Install the rear boiler cover
1
Control device cover
2
Rear boiler cover
2
1
Содержание Logano G215 WS
Страница 58: ...Index 13 Logano G215 WS We reserve the right to make any changes due to technical modifications 58...
Страница 59: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 59...
Страница 60: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 60...
Страница 61: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 61...