Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
27
7.3
Installation when supplied as a pre-assembled block
Pre-assembled boiler blocks are leak tested in the
factory prior to delivery.
z
Cut through safety straps.
z
Remove the pallet prior to positioning the boiler
block.
7.3.1 Sealing the sensor well
z
Sealthe sensor well R ¾ from the top into the Rp ¾
tapped hole of the connecting block test port.
7.4
Installation steps for boilers supplied in sections and as a pre-assembled block
Carry out the steps detailed in this section for deliveries
in sections or as block. Any discrepancies in the
installation procedure between the sectional and block
delivery are highlighted below.
7.4.1 Fitting adjustable feet
Level the boiler, if necessary, using the adjustable feet
(packaging
Î
standard delivery page 13) to prevent air
pockets forming inside the boiler.
z
Tip the boiler or support it on a timber support.
z
Insert the adjustable feet 5
–
10 mm.
z
Gently set the boiler down.
Fig. 27 Boiler block on pallet (as delivered)
1
Securing straps
1
WARNING!
RISK TO LIFE
from falling materials.
z
Ensure a suitable means for bearing
the load is available.
z
Observe all locally applicable Health &
Safety at Work regulations relating to
lifting equipment.
Fig. 28 Sealing the sensor well
1
Sensor well R ¾ (test port – Length: 110 mm)
1
Fig. 29 Fitting adjustable feet
Содержание Logano G215 WS
Страница 58: ...Index 13 Logano G215 WS We reserve the right to make any changes due to technical modifications 58...
Страница 59: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 59...
Страница 60: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 60...
Страница 61: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 61...