Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
17
7.1
Assembly when delivered in separate sections
z
Assemble all boiler sections in accordance with the
following instructions and diagrams.
7.1.1 Preparation of boiler sections
z
Locate the rear section on two timber supports.
z
Clean the boiler hubs with emery paper and a rag.
z
Remove any burrs which might have been created
with a file.
z
Clean the packing spring or packing groove where
required using a wire brush and rag.
z
Clean the hub sealing faces with a rag soaked in
white spirit.
z
Evenly coat the boiler hub sealing faces with red lead
putty.
z
Coat the packing spring or packing groove with
adhesive (adhesive base).
Fig. 5
Remove burr
1
Boiler hubs
2
Rear section
3
Timber supports
4
Sealing spring
3
1
2
1
4
CAUTION!
RISK TO HEALTH and
RISK OF BURNING
through released vapours and easily
flammable cleaning agents.
z
During the use of red lead putty,
adhesives and solvents ensure
adequate ventilation inside the boiler
room.
z
When using solvents, avoid naked
flames, incandescence and sparks.
z
Please observe the manufacturer's
handling and safety instructions.
Fig. 6
Coating the boiler hubs with red lead putty
1
Boiler hub sealing face
2
Sealing spring
1
1
2
Содержание Logano G215 WS
Страница 58: ...Index 13 Logano G215 WS We reserve the right to make any changes due to technical modifications 58...
Страница 59: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 59...
Страница 60: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 60...
Страница 61: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 61...