Assembling the boiler block
7
Logano G215 WS - We reserve the right to make any changes due to technical modifications.
24
z
Take the nuts off the threaded studs.
z
Push the flat gasket over the feed pipe.
z
Push the feed pipe with the connecting block and flat
gasket into the upper boiler hub at the rear of the
boiler.
z
Locate the connecting block on the threaded studs,
and tighten the four nuts by hand.
z
Evenly tighten the connecting block nuts diagonally
using a torque wrench (torque: maximum 60 Nm).
Seal connections that are not required using the plugs
supplied. When the boiler is supplied as a pre-
assembled block, these plugs will already have been
fitted.
z
Insert plugs with flat gaskets into the connections
that are surplus to requirements.
7.1.10 Sealing the sensor well
z
Seal the sensor well R ¾ from the top into the Rp ¾
tapped hole of the connecting block test port.
Fig. 19 Installing the feed pipe and connecting block
1
Flat gasket
1
Fig. 20 Assembling the connecting block
1
Torque wrench
1
Fig. 21 Sealing connections that are surplus to
requirements.
1
Plug
2
Flat gaskets
1
1
2
2
Fig. 22 Sealing the sensor well
1
Sensor well R ¾ (test port – Length: 110 mm)
1
Содержание Logano G215 WS
Страница 58: ...Index 13 Logano G215 WS We reserve the right to make any changes due to technical modifications 58...
Страница 59: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 59...
Страница 60: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 60...
Страница 61: ...Notes Logano G215 WS We reserve the right to make any changes due to technical modifications 61...