![Beckman Coulter Avanti J-25 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/beckman-coulter/avanti-j-25/avanti-j-25_instruction-manual_2719702023.webp)
1-10
Specifications and Preinstallation Requirements
Additional Requirements for Three-Phase Power Connections
For three-phase power service to the centrifuge, use the “Y”
connected three-phase configuration shown in Figure 1-3. Also note
the following information:
• The steady state current draw of the centrifuge can be as high as
12 amperes per phase, depending on the voltage.
• Inrush current to the centrifuge is 100 amperes for up to 2 seconds
during the refrigeration start period. Circuit breakers, whether
thermal or magnetic actuating, must be a “motor start” delay type.
• The centrifuge can tolerate a drop of 15 volts during the start
period at low line voltage (see Figure 1-3 for the acceptable
voltage ranges). The mains power for the centrifuge must be of
sufficient wire gauge to provide this condition. The wire gauge
required at a particular site must be determined by a facilities
engineer at that site.
Figure 1-3. Correct and Incorrect Three-Phase Power Configurations
SPACE AND LOCATION REQUIREMENTS
• Locate the instrument on a clean, level floor.
• Select a location away from heat-producing laboratory equipment.
If ambient temperature exceeds 38°C (100°F), premature compo-
nent failure may result.
Circuit
Common
(Neutral)
Safety
Ground
180–264
312–456
Incorrect Configuration
“Delta”
Correct Configuration
“Y”
N
Содержание Avanti J-25
Страница 1: ...Instruction Manual J325I IM 7 High Performance Centrifuge Avanti J 25...
Страница 6: ......