2-5
Z MED Medical Air System
4107 9022 67.00
partment at 1-888-4MEDGAS (1-888-463-3427)
for network lengths over 250 meters.
2.8.2 Connector Cabling Procedure
Prepare the end of each cable (See FIG. 2.8.2.
CAN Cable Preparation) for the CAN connec-
tor by removing either 1-3/4” (45 mm) or 2-3/8”
(60 mm) of the cable insulation, depending on
whether the cable is incoming or outgoing. Next,
remove the plastic foil, leaving 3/8” (10 mm) of
cable shielding. Then remove the fill-up material
and the white/blue conductor. Finally, remove
3/16” (5 mm) of insulation from the blue, orange
and white/orange conductors.
2.8.1 Cable
The CAN cable (1 pair + ground) should be used
to connect the machines and controller togeth-
er. This cable has been fully tested and qualified
for use with
BeaconMedæs
equipment and as
such is the only CAN cable
BeaconMedæs
rec-
ommends.
This cable is in accordance with ISO 11898 and
allows network segments of maximum 250 me-
ters. A total network length of 500 meters is
possible, but then a repeater has to be used.
Contact
BeaconMedæs
Technical Services de-
2.8.3 Terminal Connector Cabling
For the connector at the beginning and end of
the network, the cable should be connected to
the terminals designated 1C-, 1C+ and GND, as
shown in FIG 2.8.3 Beginning/End Connector
Wiring. Make sure that the wire shielding touch-
es the shielding plate of the connector. Close
the connector and set the terminating switch to
“ON” (FIG 2.8.3a Connector Switch Setting). The
CAN wires should be connected inside the CAN
connector as follows:
•
Blue wire to terminal GND
•
White/Orange wire to terminal 1C-
•
Orange wire to terminal 1C+
The switch on the back of the connector should
be in the “ON” position for connectors at the be-
ginning and end of the network (See FIG 2.8.5
Connector Switch Setting). Plug the connector
into the LAN port on the back of the Elektroni-
kon controller.
Important:
Be absolutely sure that the cable
is connected to the correct terminals inside the
start and end connectors. Failure to do this will
prevent the network from functioning properly
and the start and/or end machines will not be
connected to the network.
FIG 2.8.2 CAN Cable Preparation
2.0 Installation
Содержание Z MED Medical Air System
Страница 2: ......
Страница 4: ......
Страница 102: ...G 3 Z MED Medical Air System 4107 9022 67 00 Appendix G Oil Indicator FIG G 2 Conversion Chart for Oil Indication ...
Страница 103: ......
Страница 104: ...1059 Paragon Way Rock Hill SC 29730 888 4 MEDGAS 888 463 3427 Fax 803 817 5750 www beaconmedaes com ...