
07-19-B1-729
FLO-GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL
9-17
Calibration
Verifying Calibration Values
11.
View the NORM value displayed in the PRI RATE location at the upper
left of the main display.
12.
View the MIN value displayed in the PRI VTBI location at the lower left
of the main display. Both values must be less than 40.
Q
If they are within specification, proceed to the next step.
Q
If they are out of specification, perform the procedure in “Air Sensor
Calibration” on page 9-6.
13.
Follow steps 14 through 18 to check that the tube misloading sensor
outputs in SEC RATE and SEC VTBI windows are within specification.
14.
Load a Baxter “s” suffix standard administration set and prime it with
fluid.
15.
With the pump door open, check the FSRR value (at SEC RATE
window) and the FSRL value (at SEC VTBI window). Both values
should display between 500 and 820.
16.
Repeat above step with the pump door closed. Both values should
display between 500 and 820.
17.
Open the door and intentionally load the tubing over the tube misloading
sensor 1L and/or 2L (Figure 11-6 , item 10).
18.
Close the door. Do not load hard components on the administration set
between the door and the base plate. The FSRL value (at SEC VTBI
window) should display 450 or less.
19.
Repeat above step on the tube misloading sensor 1R and/or 2R
(Figure 11-6 , item 11). The FSRR value (at SEC RATE window) should
display 450 or less.
Note:
The sensors are normal when the values in steps 15 through 18 are within
specification.
W
hen any of these values are out of specification, replace the
tube misloading sensor per “Replacement of Force Sensing Resistor (FSR)
Devices for Tube Misloading Sensors” on page 8-15.
20.
Press the
TIME
key and check that the voltage Vcpu reading in the SEC
RATE window of the display is within 472 - 579. Actual voltage =
displayed data x 0.00976.
Содержание Flo-Gard 6301
Страница 8: ...vi FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 12: ...x FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 20: ...1 General Information 1 6 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 30: ...2 Controls and Indicators 2 10 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 34: ...3 Administration Sets 3 4 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 36: ...4 Nurse Call 4 2 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 74: ...7 Troubleshooting Chart 7 28 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 110: ...8 Disassembly Reassembly 8 36 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 200: ...13 Overview 13 2 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 201: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 3 Figure 13 1 System Block Diagram ...
Страница 205: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 7 Figure 13 5 Power Supply Section ...
Страница 206: ...13 8 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 6 DC Power Supply ...
Страница 210: ...13 12 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 10 Master CPU Schematic ...
Страница 213: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 15 Figure 13 13 Address Decoder ...
Страница 216: ...13 18 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 16 Slave CPU Schematic ...
Страница 220: ...13 22 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 20 CPU PCB Sensor Block ...
Страница 221: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 23 Figure 13 21 PPI Block 1 ...
Страница 222: ...13 24 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 22 PPI Block 2 ...
Страница 224: ...13 26 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 24 Air Sensing Block ...
Страница 226: ...13 28 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 26 Display PCB ...
Страница 229: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 31 Figure 13 29 LCDs for Pump 1 ...
Страница 230: ...13 32 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 30 LCDs for Pump 2 ...
Страница 231: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 33 Figure 13 31 LED Lamps ...
Страница 232: ...13 34 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 Figure 13 32 Audible Alarm PCB ...
Страница 233: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 35 Figure 13 33 Backup Buzzer PCB ...
Страница 234: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 36 Figure 13 34 Terminal PCB ...
Страница 235: ...07 19 B1 729 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 13 37 Figure 13 35 Accessories ...
Страница 244: ...A A 6 FLO GARD 6301 DUAL CHANNEL VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07 19 B1 729 ...
Страница 251: ...07 19 B1 729 ...