9. General operation example
In this application only one background is required, but in applications where more than one background is
required, repeat steps 2 thru 6 until done.
C3: Add Input
1. Click on the
Input
tab to select the inputs that will be de
fi
ned.
2. Click on the
+Add Input
blue button to enter the Add mode.
3. Click on the
fi
rst SDI connector of slot 4 to de
fi
ned as the camera 1 input.
4. Click on the
Done Adding
button to exit the Add mode.
5. Double click on
Input1
in the Name list to edit the name.
6. When the area turns blue, click the eraser icon to clear the
fi
eld.
7. Type a new name: “CAM1-Stage”. Hit enter when done.
8. Repeat steps 2 thru 6 until done. Enter the names as shown in the image below.
Image 9-7
C4: Add Output
1. Click on the
Output
tab to select the outputs that will be de
fi
ned.
2. Click on the
+Add Output
blue button to enter the Add mode.
3. Click on the
fi
rst HDMI connector of slot 11.
4. Click on the
Done Adding
button to exit the Add mode.
5. Double click on
Output1
in the Name list to edit the name.
6. When the area turns blue, click the eraser icon to clear the
fi
eld and type a new name, “DSM”. Hit enter when done.
7. Repeat steps 2 thru 6 until done to add the rest of the output connectors with the following names:
-
Site projector (SDI, Slot 13–1)
-
Main-Left Projector (SDI, Slot 13–3)
-
Main-Right Projector (SDI, Slot 13–4)
When you are done the menu should look like this:
R5905948 E2 12/12/2014
195
Содержание Event Master E2
Страница 1: ...E2 User s guide R5905948 00 12 12 2014...
Страница 8: ...Table of contents 4 R5905948 E2 12 12 2014...
Страница 16: ...2 Safety 12 R5905948 E2 12 12 2014...
Страница 32: ...3 General 28 R5905948 E2 12 12 2014...
Страница 82: ...6 GUI orientation Image 6 8 78 R5905948 E2 12 12 2014...
Страница 94: ...6 GUI orientation Image 6 20 90 R5905948 E2 12 12 2014...
Страница 115: ...6 GUI orientation Image 6 37 Thumbnail view Image 6 38 R5905948 E2 12 12 2014 111...
Страница 186: ...7 System Setup 182 R5905948 E2 12 12 2014...
Страница 192: ...8 Updating firmware 188 R5905948 E2 12 12 2014...
Страница 196: ...9 General operation example Image 9 3 192 R5905948 E2 12 12 2014...
Страница 213: ...9 General operation example Image 9 25 R5905948 E2 12 12 2014 209...
Страница 216: ...9 General operation example 212 R5905948 E2 12 12 2014...
Страница 220: ...10 Maintenance 10 2 Process Overview Flow chart Image 10 2 216 R5905948 E2 12 12 2014...
Страница 226: ...10 Maintenance Image 10 11 2 Pull out the Front cover and lay it flat in front of the unit 222 R5905948 E2 12 12 2014...
Страница 281: ...10 Maintenance Disregard the heatsink from the spare kit R5905948 E2 12 12 2014 277...
Страница 282: ...10 Maintenance 278 R5905948 E2 12 12 2014...
Страница 286: ...11 Environmental information Republic of Turkey In conformity with the WEEE Regulation 282 R5905948 E2 12 12 2014...
Страница 288: ...11 Environmental information 284 R5905948 E2 12 12 2014...
Страница 298: ...B Remote Control Protocol 294 R5905948 E2 12 12 2014...
Страница 299: ...C Troubleshooting C TROUBLESHOOTING R5905948 E2 12 12 2014 295...
Страница 300: ...C Troubleshooting 296 R5905948 E2 12 12 2014...