6. GUI orientation
Z-Order
The layer priority (z-order) is based by the order they are added in destination menu.The layers that are added
fi
rst have the lowest
priority. For example; layer1 is lower priority than layer2. Layer2 is lower priority than layer3.
Freeze
Note: When a layer is frozen, the outline and the text become
blue and an icon of a snow
fl
ake appears in the bottom right
hand corner.
Layer adjustments in the Preview Screen
Users can also left click on a layer to move it around inside the Preview screen. A layer can also be moved with the keyboard’s
arrow keys.
Size adjustments can be performed by selecting and right clicking the vertical, horizontal or any corner of the layer. Any size adjust-
ment maintains the aspect ratio.
These operations can also be performed on multiple layers. First the layers can be selected individually with a right mouse click.
Selected layers are highlighted with a blue border.
AUX Destination Canvas
Assigning inputs/sources to AUX destination works the same way as in the screen destinations within the constraints of the AUX
destinations. Only one input can be assigned to each destination and it is always at full screen. Assigning a new input to the
destination, overrides the previous input.
Image 6-43
114
R5905948 E2 12/12/2014
Содержание Event Master E2
Страница 1: ...E2 User s guide R5905948 00 12 12 2014...
Страница 8: ...Table of contents 4 R5905948 E2 12 12 2014...
Страница 16: ...2 Safety 12 R5905948 E2 12 12 2014...
Страница 32: ...3 General 28 R5905948 E2 12 12 2014...
Страница 82: ...6 GUI orientation Image 6 8 78 R5905948 E2 12 12 2014...
Страница 94: ...6 GUI orientation Image 6 20 90 R5905948 E2 12 12 2014...
Страница 115: ...6 GUI orientation Image 6 37 Thumbnail view Image 6 38 R5905948 E2 12 12 2014 111...
Страница 186: ...7 System Setup 182 R5905948 E2 12 12 2014...
Страница 192: ...8 Updating firmware 188 R5905948 E2 12 12 2014...
Страница 196: ...9 General operation example Image 9 3 192 R5905948 E2 12 12 2014...
Страница 213: ...9 General operation example Image 9 25 R5905948 E2 12 12 2014 209...
Страница 216: ...9 General operation example 212 R5905948 E2 12 12 2014...
Страница 220: ...10 Maintenance 10 2 Process Overview Flow chart Image 10 2 216 R5905948 E2 12 12 2014...
Страница 226: ...10 Maintenance Image 10 11 2 Pull out the Front cover and lay it flat in front of the unit 222 R5905948 E2 12 12 2014...
Страница 281: ...10 Maintenance Disregard the heatsink from the spare kit R5905948 E2 12 12 2014 277...
Страница 282: ...10 Maintenance 278 R5905948 E2 12 12 2014...
Страница 286: ...11 Environmental information Republic of Turkey In conformity with the WEEE Regulation 282 R5905948 E2 12 12 2014...
Страница 288: ...11 Environmental information 284 R5905948 E2 12 12 2014...
Страница 298: ...B Remote Control Protocol 294 R5905948 E2 12 12 2014...
Страница 299: ...C Troubleshooting C TROUBLESHOOTING R5905948 E2 12 12 2014 295...
Страница 300: ...C Troubleshooting 296 R5905948 E2 12 12 2014...