![Axon Axopatch 200B Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/axon/axopatch-200b/axopatch-200b_theory-of-operation_3040439030.webp)
14
•
USE OF THE PATCH CLAMP – A TUTORIAL
Axopatch 200B, Copyright 1997-1999, Axon Instruments, Inc.
Adjustment of Pipette Capacitance Compensation
Now connect the model cell in the PATCH position to the headstage connector and
surround with grounded aluminum foil. With the panel meter set to I
RMS
, the reading should
be less than 0.200 pA rms. Return the meter setting to I.
Turn the gain switch (
α
) to 10 and turn on SEAL TEST. On the oscilloscope, you will see
two capacitance transients, one near the beginning of the sweep and the other near the end.
They will be of opposite polarity. This is comparable to what you would see immediately
following a gigohm seal between your pipette and cell. Using the FAST MAG control,
reduce the size of the capacitance transient as far as possible. Switch the gain to 500. Now
use both the FAST MAG and FAST
τ
controls to minimize the transient. This is done
iteratively. Turn the FAST MAG slightly and then readjust the FAST
τ
for minimum
transient. Do this over and over again until you find the setting where the transient is
finally minimized (Figure 2). With some practice, you will be able to use the two controls
simultaneously to compensate stray capacitance rapidly. With real electrodes, but probably
not with your model cell, the capacitance transient will have more than one component.
SLOW MAG and SLOW
τ
controls are provided for minimizing a second electrode
component in real experiments.
Adjustment of Leak Subtraction
With the model cell still in the PATCH position, turn off the SEAL TEST. The current
should still read zero on the meter. Turn the HOLDING COMMAND switch to "+"
(HOLDING COMMAND toggle set to "x1") and use the HOLDING COMMAND control
to move the current substantially off zero. While looking at the oscilloscope screen, turn
the LEAK SUBTRACTION
control until the current is returned to zero. This circuit sums
a scaled version of the command signal with the current. The scaling is determined by the
LEAK SUBTRACTION control. Now change the HOLDING COMMAND switch from
"+" to "-". If the LEAK SUBTRACTION circuit is properly adjusted, the current trace
will stay on zero as the HOLDING COMMAND is switched back and forth between "+"
and "-".
Содержание Axopatch 200B
Страница 2: ......
Страница 8: ...INFORMACION IMPORTANTE Axopatch 200B Copyright March 1997 1999 Axon Instruments Inc ...
Страница 26: ......
Страница 56: ......
Страница 86: ......
Страница 118: ......
Страница 134: ......
Страница 136: ......
Страница 146: ......
Страница 148: ......
Страница 150: ......
Страница 152: ......
Страница 153: ...Circuit Diagrams Request Form ...