![Axon Axopatch 200B Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/axon/axopatch-200b/axopatch-200b_theory-of-operation_3040439019.webp)
FUNCTIONAL CHECKOUT
•
3
Chapter 2
Chapter 2
FUNCTIONAL CHECKOUT
When you receive your Axopatch 200B, you should first run a functional checkout to
ensure the proper functioning of the instrument. All units are burned-in and thoroughly
tested at the factory before shipping. If you observe any damage caused by shipping or if
you encounter problems with the functional checkout, please call the factory.
Startup Procedure
For the initial checkout, the Axopatch 200B should be situated on a benchtop away from
other equipment. Do not install in a rack until the checkout is complete. Make sure that
the power is OFF. An oscilloscope is the only other piece of equipment required for these
tests. A large sheet of aluminum foil is needed.
1) The only connections to the Axopatch 200B should be: a) the power cable, b) the
headstage, c) a cable from the SCALED OUTPUT BNC to one channel of the
oscilloscope.
Take care to prevent static discharge near the headstage input connector.
Turn the power on.
Содержание Axopatch 200B
Страница 2: ......
Страница 8: ...INFORMACION IMPORTANTE Axopatch 200B Copyright March 1997 1999 Axon Instruments Inc ...
Страница 26: ......
Страница 56: ......
Страница 86: ......
Страница 118: ......
Страница 134: ......
Страница 136: ......
Страница 146: ......
Страница 148: ......
Страница 150: ......
Страница 152: ......
Страница 153: ...Circuit Diagrams Request Form ...