© 2009 Austin Kontore LLC
Page 28 of 54
Slide the 3’ x 3’ middle Core Square through the four posts until
it sits on top of the two clamped Fixed Screen Units.
Once the middle prefab square is in place, the unit will look like
this. The middle Core Square is sitting on top of the top Fixed
Screen Units.
Important:
Verify that
top
of the middle Core Square is
24” high – it should line up with the pencil marks you made
previously.
Using a small level, ensure that the Middle Core Square is level.
Drill a hole about ¾” from the top of the Middle Square. The
hole should be approximately 1 ½” deep and go through the
Core and into the Post.
Important:
Hold the pieces tightly while drilling.
Fasten the Post to the corner of the Core Square with one 1
5/8” screw.
Note:
The first corner of the Middle Core Square is now
secured and ready for more drilling and fastening.