17
Installation
Boiler transport
1. Remove the plastic strip.
2. Open the 4 upper folders, and remove the documentation
and the condense pipe.
3. Remove the cartboard inserts, remove the cartboard box.
4. Remove the 4 screws from the bottom part of the boiler and
from the roll off rails on the pallet.
5. Position and fix the roll off rail on the pallet, push the boiler
forward along the roll off rail to the ground.
6. Move the boiler to the connection or to the cascade rack.
7. Remove the water and gas plastic cap, connect the condense
pipe, and follow the installation manual.
8. When the boiler is connected, push the four brakes to block it.
The ATAG XL F is a fully equipped
compact heating system, which has
been pre-set and tested at the factory.
The package dimensions for all
appliances are:
Width 750mm
Height 1200mm
Depth 800mm
This makes it possible to transport
all models in one piece through a
normal door.
The boiler can be moved using a
fork-lift or pallet truck.Unpacking
instructions are printed on the
cardboard box. Please follow the
proposed steps.
Disassembly of panelling
The appliance casing panels can
be easily removed and this is
recommended while the appliance is
being installed. This limits the potential
for damage to occur.
Handling and carrying precautions:
- Wear protective clothing and gloves
to protect from any sharp edges.
- The boiler should be handled with its
pallet using a fork lifter, wheels can
be used for final positioning.
Panelling should be attached and
secured with the supplied screw,
after assembly of the boiler, or after
maintenance works.