82
25/03/19 09:00
–10°
1.5 bar
CH Pump Overrun
1
2
T10
BMS
32°
Commissioning
Flue gas analysis
Full load (Step 1/3)
Legend
1. Measuring point for the flue gas
probe.
Step 1: Check on full load
Step 2: Check on low load
Step 3: Adjustment (if necessary).
Step 1: O
2
/ CO
2
check on full load
The O
2
or CO
2
setting is preset at the
factory to E, namely natural gas, for all
equipment units. A calibrated O
2
or CO
2
control measurement must be carried
out during commissioning.
- Ensure that the boiler is in
operation and that the heat, which
it produces, can be discharged.
Set the load of each engine
- Press the chimney sweep button for
5 seconds;
- Select with
“+”
or
“–”
burner 1 or 2
(in case it is present). Press OK;
- The boiler will switch to CH power
shown on the screen.
The modulation rate can now be
adjusted between minimum 0%
and maximum 100%.
- Press the
“+”
button until you reach
100%;
- Press
OK
;
The selected engine will switch
to max power output, the screen
shows 100% (heating capacity).
- Calibrate the Flue Gas Analyser,
and then insert the flue gas probe
of the Flue Gas Analyser into the
measuring point of the flue gas pipe
“1” (see illustration);
- Wait for one minute and then carry
out a combustion analysis;
- Check whether the O
2
/CO
2
values
that are listed below correspond to
the measured value.
After this check has been done, once
more test the O
2
/CO
2
value at low load
(see Step 2 on page 84).
The O
2
/ CO
2
check consists of 2 steps or, if necessary, 3 steps:
5 sec.
1
Set the load of complete boiler
- Press the chimney sweep button
for 5 seconds;
- Select with
“+”
or
“–”
burner 1+2
The Chimney Power Level is now
Settable (with “+” and “–” buttons)
between the minimum Power and
the maximum Power of the complete
boiler.
Diagnostics
During chimney sweep function it is
possible to go to the diagnostics by
means of
1
Press the ESC and OK buttons at
the same time for 7 seconds
.
2.
Use “+” to go down and “–” to go
up to highlight
007 as the Technical Code.
Press OK.
3
Use
“+”
to go down and
“–”
to go
further
O
2
/ CO
2
check on full load (Step 1)
Full load
Natural gas (G20)
Propane (G31)*
O
2
Nominal 4,8%
Nominal 5,0%
Minimum 4,1%, maximum 5,6%
Minimum 4,5%, maximum 5,4%
CO
2
Nominal 9,0%
Nominal 10,5%
Minimum 8,6%, maximum 9,4%
Minimum 10,2%, maximum 10,8%
Values are valid with closed cover/air box.
*only possible if LPG conversion kit is installed